We read your photo as:
Nomsa only has a 15 ml tablespoon to measure oil. Calculate how many full tablespoons of oil she will need for one batch.
ScanSolve AI Answer
Step-by-step solution
13 stepslet's solve these questions based on the recipe.
1.4 Nomsa only has a 15 ml tablespoon to measure oil. Calculate how many full tablespoons of oil she will need for one batch.
Identify the amount of cooking oil needed for one batch from the recipe (from the previous problem's context).
Cooking Oil needed =
Calculate the number of tablespoons needed.
Nomsa will need of oil.
1.5 Calculate the amount of yeast (in grams) Nomsa would need if she decided to only make 10 large vetkoeks.
Identify the amount of yeast for a standard batch and the number of vetkoeks a standard batch makes (from the previous problem's context, a batch makes 40 vetkoeks).
Yeast for a standard batch =
Number of vetkoeks per standard batch = 40Calculate the scaling factor for making 10 vetkoeks.
Calculate the amount of yeast needed.
Nomsa would need of yeast.
1.6 Nomsa wants to make 120 vetkoeks in total. Calculate how many litres of lukewarm water she will need for this order.
Identify the amount of lukewarm water for a standard batch and the number of vetkoeks a standard batch makes.
Lukewarm Water for a standard batch =
Number of vetkoeks per standard batch = 40Calculate the number of batches needed for 120 vetkoeks.
Calculate the total amount of lukewarm water needed.
Nomsa will need of lukewarm water.
1.7 Nomsa wants to have the first batch of 40 vetkoeks finished frying at 11:00.
1.7.1 Calculate the total time, in minutes, it takes to complete ONE batch.
List the time components for one batch from the recipe (from the previous problem's context).
Mixing Time =
First Rise =
Second Rise =
Frying Time = . Assuming this refers to the total duration of the frying process for the entire batch (i.e., 5 minutes for the first side of all vetkoeks, then 5 minutes for the second side of all vetkoeks), the total frying time is .Sum the time components.
The total time to complete one batch is .
1.7.2 Determine the latest time she should start her preparation to ensure the batch is ready at 11:00.
Identify the desired finish time and the total time required.
Finish time =
Total time for one batch =Convert the total time into hours and minutes.
Subtract the total time from the finish time.
The latest time she should start her preparation is .
Still stuck on this one?
Ask a follow-up, and the answer starts from this question.
More Mathematics Questions

Handwritten Step-by-Step Solution
Get this as a handwritten image on WhatsApp — like a tutor wrote it for you.
Try on WhatsApp