API 1110, Section 3.8.3 Personnel conducting a pressure test should keep: a. A daily report b. Complete record of the test, including details of the test operation and events such as weather variations, test failures, bleedoffs, repressurizations, and so forth c. A weld log d. A temperature chart Which is correct?
Computer Science
ScanSolve AI Answer
b. Complete record of the test, including details of the test operation and events such as weather variations, test failures, bleedoffs, repressurizations, and so forth
Explanation: According to API 1110, Section 3.8.3, personnel conducting a pressure test should keep a complete record of the test. This record must include details of the test operation and significant events such as weather variations, test failures, bleedoffs, and repressurizations to ensure a thorough and accurate account of the testing process.
Was this helpful?
Still stuck on this one?
Ask a follow-up, and the answer starts from this question.
Got a different question?Ask your own question
More Computer Science Questions
QAPI 1110, Section 3.6 Before testing begins, a ________ with explanatory notes and data should be…QAPI 1110, Section 3.2.1 The pressure testing of newly constructed liquid pipelines and replaced…QQ22. A hydrotest of a plant pipe spool shows a pressure drop of 5% after 1 hour (design pressure…QThe test pressure for each pressure test conducted under 195.304 must be maintained throughout the…QInspection personnel shall be qualified by and ____ (A) Resume , Training (B) API 1169 ,Training (C)…

Handwritten Step-by-Step Solution
Get this as a handwritten image on WhatsApp — like a tutor wrote it for you.
Try on WhatsApp