The test pressure for each pressure test conducted under 195.304 must be maintained throughout the part of the system being tested for ___ continuous hours at a pressure equal to ___ percent, of more, of the maximum operating pressure.
Law
ScanSolve AI Answer
Answer
According to 49 CFR 195.304(a), the test pressure for each pressure test must be maintained for at least 4 continuous hours. The pressure must be equal to or greater than 1.25 times the maximum operating pressure, which translates to 125 percent.
Therefore, the blanks should be filled with 4 and 125.
The final answer is
Was this helpful?
Try one yourself
A new problem that tests the same skill.
Still stuck on this one?
Ask a follow-up, and the answer starts from this question.
Got a different question?Ask your own question
More Law Questions
QQ22. A hydrotest of a plant pipe spool shows a pressure drop of 5% after 1 hour (design pressure…QAPI 1110, Section 3.8.3 Personnel conducting a pressure test should keep: a. A daily report b…QAPI 1110, Section 3.2.1 The pressure testing of newly constructed liquid pipelines and replaced…QAt stp amount of pressure ,to&atmQ1.2 The work done during the constant pressure process

Handwritten Step-by-Step Solution
Get this as a handwritten image on WhatsApp — like a tutor wrote it for you.
Try on WhatsApp