Give out good solution with out explanation, and give out in English language
English
ScanSolve AI Answer
Answer
Step-by-step solution
5 stepsHere is the solution:
Calculate minimum green time for pedestrians ().
For Road A:
For Road B:
Calculate critical flow ratios () and total critical flow ratio ().
Calculate optimal cycle length using Webster's formula ().
Assuming total lost time .
Determine the minimum cycle length required to satisfy pedestrian green time ().
For Road A:
For Road B:
The maximum required value for is .
Select the design cycle length.
Compare and .
The design cycle length is the greater of the two.
Design Cycle Length =