To repair a stretch of a road, 4 people can do it in 18 days. How many people are required to do it in 12 days? 10. In Kong'oo's farm, the number of goats is less than or equal to the number of sheep
ScanSolve AI Answer
Answer
Step-by-step solution
7 stepsHere are the solutions to the problems:
9. To repair a stretch of a road
Step 1: Identify the relationship between the number of people and the time taken.
This is an inverse proportion problem. The total amount of work is constant.
Let be the initial number of people and be the initial number of days.
Let be the new number of people and be the new number of days.
The relationship is given by .
Step 2: Substitute the given values into the equation.
We have people, days, and days. We need to find .
Step 3: Solve for .
Divide both sides by 12:
To complete the work in 12 days, will be required.
10. In Kong'oo's farm
Part a· 3 steps
Form a compound inequality
Identify the given information.
Number of cows
Number of sheep
Let represent the number of goats.Translate the conditions into inequalities.
"The number of goats could be less than or equal to that of sheep" means .
"but more than that of cows" means .Combine the two inequalities into a compound inequality.
The compound inequality is .
Part b· 4 steps
Represent the inequality formed on a number line
Draw a number line and mark the relevant numbers.
For , place an open circle at 3 (since 3 is not included).
For , place a closed circle at 9 (since 9 is included).
Draw a line segment connecting the open circle at 3 and the closed circle at 9 to show all possible values of .
<---------------------------------------------------------------------> ... -1 0 1 2 (3) 4 5 6 7 8 [9] 10 11 12 ... ^ ^ | | Open circle at 3 Closed circle at 9