Hydro-electric power (HEP) stations in Uganda:
The major power source and HEP project in Uganda is the Owen Falls Dam. The River Nile flows out of Lake Victoria at this site, providing a natural waterfall for power generation. It produces 162MW, supplying most of Uganda's electricity and exporting about 30MW to Kenya.
Physical factors that have favored high hydro-electric power production in Uganda:
- Large volume of water from River Nile/Lake Victoria to drive the turbines.
- The Owen Falls/natural waterfall for power generation.
- High rainfall throughout the year to ensure a high volume of water.
- Presence of deep valleys/gorges which reduced the cost of dam construction.
- Presence of impervious/non-porous rocks that prevent seepage of water underground.
- Regular supply of water from River Nile/Lake Victoria, enabling continuous production of electricity.
- Presence of hard basement rocks for a firm foundation.
Places in Kenya where geothermal energy has potential of being harnessed:
- Mt. Longonot/Suswa
- Lake Bogoria
- Eburru
- Menengai Crater
- Lake Turkana
- Lake Magadi
- Lake Baringo
- Olkaria
- Homa hills
- Mai Mahin
Reasons why geothermal power has not been fully exploited in Kenya:
- Inadequate capital required for exploitation.
- There is a shortage of skilled personnel, as the country relies on expatriates.
- The country faces a low level of technology, which hinders exploitation of the energy.
- Most of the potential sites are found in remote/inaccessible areas, making exploitation difficult and expensive.
- Danger of land subsidence as tectonic fluids are withdrawn.
Ways in which Kenya has benefited from the development of geothermal power:
- It has provided an alternative source of energy.
- It has increased Kenya's energy output.
- It has helped stabilize the cost of electricity for consumers.
- It has helped in opening up formerly remote areas.
- It has increased employment opportunities.
- It has led to the reduction of importation of hydro-electric power from Uganda, saving foreign exchange.
Factors favouring development of HEP projects in Africa:
i) Presence of hard basement rocks to provide a firm foundation for dam construction.
ii) Presence of steep rivers/waterfalls/rapids to provide a massive hydraulic force head for power generation.